Tracking Work Orders, Change Orders, and Other Forms on Projects in Ontraccr

🛠️ Tracking Work Orders, Change Orders, and Other Forms on Projects in Ontraccr Overview
 

Forms are the backbone of real-world documentation inside a project.

Ontraccr automatically organizes Work Orders, Change Orders, and Other Forms into their own easy-to-navigate tabs — helping you stay on top of project paperwork effortlessly.


🎯 Why Track Forms at the Project Level?

  • Quickly find Work Orders, Change Orders, and all project-related forms.
  • View the current status of submitted documents.
  • Keep a full audit trail of field activities, approvals, and changes.
  • Export records when needed for clients or internal teams.

📋 Work Orders Tab

Inside the Work Orders tab:


📄 What You See

  • A list of all submitted Work Order forms tied to this project.
  • Key fields like:
    • Work Order Number
    • Created By
    • Status (e.g., Draft, Submitted, Approved)

🛠️ Actions Available

  • Filter and sort Work Orders by status, number, user, or date.
  • Open any Work Order to view details.
  • Copy a Work Order to create a new one quickly (Copy Form option).
  • Cancel a Work Order if needed (depending on status and permissions).

✅ Ideal for tracking daily work requests, scope changes, and subtrade assignments!


🔄 Change Orders Tab

Inside the Changes tab:


📄 What You See

  • All Change Order forms related to the project.

🛠️ Actions Available

  • Same actions as Work Orders:
    • Filter, Sort, View, Copy, Cancel.
  • Export the list as a CSV file.

🧠 Note: Exporting creates a CSV showing basic form info — not full PDF documents of the forms.


🗂️ Other Forms Tab

Inside the Other Forms tab:


📄 What You See

  • All other forms linked to this project that don't fit into Work Orders or Change Orders.
    • Examples: Safety Reports, Quality Control Checklists, Daily Site Logs.

🛠️ Actions Available

  • Same powerful options:
    • Filter by Form Type (Safety, Daily Logs, Inspections, etc.)
    • Search by keywords or user
    • View, Copy, or Cancel forms.

✅ This tab serves as your full document control center!


🧠 Tips & Edge Cases

Form Types Must Be Set Correctly:

Forms show up in the right tabs based on the type you assigned during form design.

Use Filters Smartly:

Combine filters (like “Status: Pending Approval” + “Form Type: Work Order”) to zoom in fast.

Copying Saves Time:

Re-use previous forms by copying and tweaking details — no need to rebuild from scratch.

Audit Trail Ready:

Every form shows who submitted, updated, or approved it — great for legal and compliance tracking.


✅ Example Scenario

You’re managing a hotel renovation:

  • Submit daily Work Orders for extra painting tasks.
  • Log Change Orders for scope increases (e.g., lobby redesign).
  • Fill out Other Forms for daily safety inspections.

Everything is organized under the right tabs, with no risk of lost paperwork.


🚀 Summary

Ontraccr’s form tracking keeps work orders, changes, and site documentation structured, searchable, and audit-friendly — giving your projects a strong documentation backbone.