Building and Managing a Gantt Chart Inside a Project in Ontraccr
📅🛤️ Building and Managing a Gantt Chart Inside a Project in Ontraccr Overview
Need a clear timeline view of your project?
The Gantt tab inside each project lets you build a project-specific Gantt chart, giving you a visual schedule of tasks, timelines, and dependencies — without needing any external tools!
🎯 Why Use the Project Gantt Chart?
- Visualize your full project timeline clearly.
- Break projects down into tasks and phases.
- Manage dependencies (what needs to finish before something else starts).
- Track progress visually as work moves forward.
- Export or update schedules easily.
🛠️ How to Build a Gantt Chart Inside a Project
➕ Create a New Gantt Chart
Inside the Gantt tab:
- Click New.
- Choose either:
- Add Task (create tasks manually one-by-one)
- Import Tasks (upload a Microsoft Gantt file)
✅ Perfect for both small and large project setups!
📝 Adding Tasks Manually
When you Add Task, fill in:
- Task Name (e.g., "Foundation Pouring")
- Start Date
- End Date
- (Optional) Assign a Responsible User
- (Optional) Link to Dependencies (other tasks that must be completed first)
✅ Tasks are automatically laid out on the Gantt timeline!
📥 Importing a Gantt File
- Upload a Microsoft Gantt (.xml) file.
- Ontraccr will map and create tasks based on your upload.
✅ Great for clients who prepare schedules in external tools and want to bring them into Ontraccr.
📈 What You See in the Gantt Tab
- Task Bars showing timelines from Start to End.
- Color Coding based on Status (e.g., Not Started, In Progress, Completed).
- Dependencies shown with lines/arrows.
- Zoom Controls (view by Days, Weeks, or Months).
✅ A full, clean visual project schedule!
🛠️ Managing the Gantt Chart
- Drag and Drop Tasks:
- Move tasks along the timeline to adjust Start or End dates.
- Edit Tasks:
- Click a task to edit Name, Dates, Responsible Users, and Links.
- Zoom In/Out:
- Focus tightly on short periods or zoom out for long-term views.
- Highlight Critical Paths (if enabled):
- See tasks that directly affect the final project completion date.
✅ Stay flexible while keeping project timing under control!
🧠 Tips & Edge Cases
Use Dependencies Carefully:
Link tasks logically (e.g., "Excavation" must finish before "Foundation Pouring" starts).
Gantt is Project-Specific:
The Gantt chart you build here is only for this project — it doesn’t affect company-wide schedules.
Schedule in Main Gantt Too (Optional):
You can also manage a consolidated Gantt across all projects from the Scheduling > Gantt view.
Import for Speed:
If schedules are already prepared externally, uploading saves a lot of setup time.
✅ Example Scenario
You’re managing a school renovation project:
- Add tasks like "Demolition," "Electrical Rough-In," "Framing," "Drywall," and "Final Inspections."
- Set start/end dates based on your project plan.
- Link dependencies (e.g., "Drywall" can't start until "Electrical" is complete).
- As work progresses, you update statuses — instantly seeing if you're ahead or behind.
All managed visually inside the project!
🚀 Summary
The Gantt Tab in Ontraccr gives you a visual, easy-to-manage schedule directly inside each project — helping you plan, track, and deliver projects on time and on target.